CWE provided engineering design services for street and storm drain improvements at three different intersections in the City of Santa Monica. Montana Avenue at 7th Street caused safety concerns and required driveway entrance and catch basin modification. Montana Avenue at 25th Street caused temporary flooding and required the installation of two catch basins. San Vicente at 7th Street didn’t allow for proper drainage and required the replacement of an existing corrugated metal pipe. Additionally, two small existing catch basins on 25th Street were designed to hold more storage space. Tasks included preparing agendas and summaries for project meetings, conducting right-of-way research, topographical surveying, conducting hydrology studies, providing design services necessary to complete construction drawings, performing a hydraulic analysis, preparing an Engineer’s Estimate, preparing contract specifications, and processing necessary permits. CWE will provide support services during the bidding and construction phases of this project as requested by the City.