Search
Close this search box.

City of Claremont Foothill Boulevard Master Plan Implementation

CWE designed storm drains, bioswales, and water quality systems and structures over a 2.5-mile stretch of roadway as part of the Foothill Boulevard Master Plan.  These improvements included approximately 1,000 feet of new storm drain, minor roadway and intersection improvements, pedestrian improvements, restriping, infill sidewalks, minor lighting improvements, bicycle lanes and protected bicycle lanes, turf removal and drought-tolerant landscaping installation in medians and some parkway areas, bioswales, and stormwater percolation devices.  Tasks included: developing project plans for bioswales and storm drains, performing a hydrologic and hydraulic study, preparing Stormwater Pollution Prevention Plan (SWPPP) and stormwater permit/planning documents, developing a construction and maintenance budget and project specifications for drainage features, preparing Plans, Specifications, and Estimates (PS&Es), responding to Requests for Information (RFIs) related to design, conducting field visits, preparing as-built drawings, and making plan revisions.

 

Project Tasks

  • Project plans for bioswales and storm drains
  • Hydrologic and hydraulic study
  • Stormwater Pollution Prevention Plan (SWPPP)
  • Stormwater permit/planning documents
  • Construction and maintenance budget
  • Project specifications for drainage features
  • Plans, Specifications, and Estimates (PS&Es)
  • RFI Response
  • Field visits
  • As-built drawings
  • Plan revisions