Confidential Utility Provider Serrano Valley Hydrology and Hydraulic Analysis

CWE performed a comprehensive hydrology and hydraulics study that assessed the hydromodification of an existing 445-acre watercourse and its impacts on four Serrano Valley transmission line tower footings and several existing access road culverts for a confidential Southern California utility client. The outcome of the study resulted in the preparation of Plans, Specifications, and Estimates (PS&Es) to upgrade the existing road culverts, provide slope stabilization, and restore the streambank to mitigate significant impacts caused by a change in the flow regime due to upstream development.